Ya-house

Construction Building Working Platform System Steel Scaffold Steps System.

stars, based on 0reviews
Price:
$1485.00 ton
items available
Total:$1485.00
Contact Us

Item specifics

Framework:
Specification:
Supporting Mode:
Lapping Form:
Transport Package:
Origin:
HS Code:

Description

Construction Building Working Platform System Steel Scaffold Steps System.


1. Our main product:


Attached Safety protection platform for lifting operation For building construction (All-steel attached lifting scaffold)
 

Set up a certain height and attached to the structure of the building structure, relying on its own lifting equipment and

devices, can climb or descend with the building structure layer by layer, with safety protection, anti-tilting, anti-falling and

synchronous lifting functions. It is composed of platform structure, lifting mechanism, power equipment, anti-tilting device,

anti-falling device and lifting synchronization control system.

Construction Building Working Platform System Steel Scaffold Steps System.Construction Building Working Platform System Steel Scaffold Steps System.


Product Parameters

Product Name:

Intelligent full steel modular attached type lifting scaffold  

Linear(Horizontal)span:

≤7m

Scaffolding Part Type:

Scaffolding Frames

Broken line or curve span:

≤5.4m

Move Method:

Attached Lifting Scaffolding

Horizontal Cantilever plate length:

≤2m and no more than 1/2 span 

Construction Properties:

Building Scaffold

Frame full height *support span:

≤110

Application:

High-rise/High Altitude building construction/Formworking supporting

Lifting Speed:

12cm/Min

Certification:

ISO9001,SGS

Anti-falling breaking distance:

≤ 80mm

Structural Style:

Integrated

Synchronization error of adjacent positions:

≤ 30mm

Colour:

Different colour available 

Working load:

≤ 2.0KN/, 3 floors & ≤ 3.0KN/, 2 floors

Surface Treatment:

Painted

Lifting load:

≤ 0.5KN/, 2 floors

Supporting Mode:

Wall climbing/ Hanging/ Attaching Scaffolding

Rate power of hoist:

500W

Specification:

customized

Rate load of hoist:

7.5T

Distance from wall:

30cm

Screen windshield coefficient:

0.42

Climbing Scaffolding Unit Height:

 ≤15m(no more than 5 floors)

 

 

Climbing Scaffolding Unit Width:

0.7m 

 

 

 

 

Our Advantages


Compare with the Cantilever steel pipe scaffolding,our steel attached lifting scaffolding have the advantage as follows:

 

1. More safety

The all-steel protection has high impact resistance and bearing capacity to prevent falling objects from high altitude during

construction;The all-steel frame design eliminates fire safety hazards;The overall time for tapping and dismantling is short,

which greatly reduces the falling incidents of people and objects in the process of tapping and dismantling.

The above points have greatly reduced the casualties at the construction site, reflected the people-oriented and

harmonious spirit, and reduced the company's safety management risks.

2.Fast progress:
 

It can guarantee the construction progress of one floor at the fastest 2.5 days, greatly improving the construction progress.
 

3.Exterior:
 

The components are horizontal and vertical, neat and uniform, and can be sprayed with LOGO and banners according to

customer needs. The colors are bright and durable, which enhances the construction image of the general contractor.

 

Product Components

Construction Building Working Platform System Steel Scaffold Steps System.

Packaging & Shipping

Packing:   Bundle, Package Box, Pallet, Container

Delivery Details: Generally it is 5-30 days, it is according to quantity.

Port:  Foshan,China

 

Our Factory

Construction Building Working Platform System Steel Scaffold Steps System.Construction Building Working Platform System Steel Scaffold Steps System.Construction Building Working Platform System Steel Scaffold Steps System.
Construction Building Working Platform System Steel Scaffold Steps System.

Project Cases


Construction Building Working Platform System Steel Scaffold Steps System.Construction Building Working Platform System Steel Scaffold Steps System.

Why Yahouse: 

We have been specialized in manufacturing container house, warehouse, prefab house, light steel villa for more than 10 years, we have a complete and advenced production line. 

1. We can design and produce various specification of products according to the customers to meet different needs. 

2. We provide short delivery period, high quanlity products. 

3. We are profession and responsible sales and techincal team. 

4. We help you purchase electrical and plumbing equipment which applicable to your country with extra cost. 
5. We warmly weclome you visit our factory before palcing an order, we will pick you up and arrange hotel for you. 

6. We give you competitive and resonable price, perfect after-sales service, strict market protections. 

More porduct, pls click: Hot sale container house 

FAQ: 

Q1: How can I place an order? 

A: After you choose productions you are interested in, you can leave us message on alibaba, or contact us via e-mail, whatsapp, or wechat. 

Q2: How to pay? 

A: : T/T wilL be more appreciated. 30% deposit before producing, 70% balance before loading. 

Q3: Can you design for me? 

A: Yes, our professional engineer team can do personalized design drawings following customers'idea. 

Q4: How to install? 

A: We will provide detailed installation video and instruction to you. Technicians will be sent to help you on site if necessary. However, the visa fee, tickets, accommation, food and wages will be under taken by buyers. 


Customer Reviews ( 0 )

Average Rating
+
Recent Reviews